Monday, October 29, 2012

Day 7: Line Group

Lots of productivity today. Put together the second box for one part of the slide. Modified the slope on our ramp, put the cross sections in, and the outside fitted. Used a lot of hot glue and bracers to make sure everything is sturdy. We now have all four pieces for our project, and the finishing touches will be well on their way soon.

Cross sections for the ramp.


Getting the inside of the slide ready to put a bottom on for next time.


The last box getting ready to be taped.





Allie Holen

No comments:

Post a Comment